tapcas.blogg.se

Vs2012
Vs2012








vs2012

At the end of the install it prompts to install the 64 bit runtime, click OK. Run the SP 29 EXE to integrate into Visual studio by right clicking on the EXE and selecting Run as Administrator, this is must due to Windows security and to properly register the COM dll’s and Registry Keys we create. VS 2008 will not use CR for VS, you need to upgrade to VS 2010->2019. You can still have CR 2008 and previous but CR for VS can only have one version (13) installed. and any other CR runtime, no longer required. Uninstall the 64 bit first and then the main package last. Note: the runtime… (64-bit) is an option when installing CR for VS, last step. Uninstall any older MSI’s and the EXE installed on your Development PC, in the screen shot below I have updated already:

vs2012

x can no longer access BusinessObjects Enterprise Servers, you need to use the BOE.

vs2012

NET runtime with CR Designer, ALL runtime for CR 2011 and above is CR for VS Note: As of CR 2011 we no longer install the. If your original project is using CR SPxx runtime, then the first thing you need to do is download the latest SP which you can get from here If upgrading from CR 2008 runtime, note the runtime is no longer in the BusinessObjects folder. NET projects Uninstalling the previous version Note: see this Blog for upgrading BOE, CRS, CRS (OEM). Visual Studio does not do a complete upgrade of the CR Assemblies.ĬR for VS minimum Framework version is based on the version noted: When upgrading existing project to the latest CR for VS runtime there are a few things you need to do after first opening your project. To assist Project Developers upgrading an older project with the latest Service Packs of Crystal Reports for Visual Studio.










Vs2012